Contact  Collection  Home5
  |  HOME  |  ABOUT US  |  PRODUCTS  |  NEWS  |  CASE  |  DOWN  |  SERVICES  |  THEME  | ENGLISH / CHINESE   
 
S11-type distributio
SH11-m enclosed Feij
SZ9/SZ11 contained r
Resin dry-type distr
Insulation dry-type 
YBM29 high/low volta
 
 
Shunt Capacitor Of T
High Voltage Shunt C
Capacitor Installati
High Voltage Local P
Type Tbbz Automatic 
AC Filter Capacitor 
High Voltage Shunt C
Special Kinds Of Cap
YL Series Gas Filled
Overvotagle Absorber
 
 
ZW8-12 series outdoo
Remove metal-exchang
 
     
 
  Capacitor Installation For Transformer Test  

First, outlined
Capacitor Installation For Transformer Test no-load tests and temperature compensation reactive components. Since transformer test their own power generating units used by the middle transformer surge to reach the test voltage transformer to reduce the capacity of generating units, compensation capacitors used to increase the power factor, reduce the cost of the investment.
Second, structural features  
Test transformer capacitor devices to shunt capacitors as the main use for single fuse protection of the input capacitors and the removal and Y, ¡÷, single phase change manually, or automatically disconnecting switch operation for the first pluggable devices to clamp the potential to make capacitors framework of the shell and fixed potential and ensure a safe and reliable operation.

   